PTP 820C, PTP 820S, PTP 820N, PTP 820A, PTP 820G and PTP 820GX.
PTP 820C, PTP 820S, PTP 820N, PTP 820A, PTP 820G and PTP 820GX., from Cambium Networks, Ltd., holds FIPS 140-2 certificate #2752 at overall level 2. The validation is historical: agencies may keep the module in existing systems but not buy it new. Below are its validation history, algorithm certificates and security policy, drawn from the NIST CMVP entry.
Certificate
| Certificate number | 2752 |
|---|---|
| Standard | FIPS 140-2 |
| Status | historical |
| Overall level | 2 |
| Module type | Hardware |
| Embodiment | Multi-Chip Stand Alone |
| Vendor | Cambium Networks, Ltd. · website |
| Hardware versions | PTP 820C, PTP 820S, PTP 820N, PTP 820A, PTP 820G, PTP 820GX, PTP820 TCC-B-MC: N000082H001, PTP820 TCC-B2: N000082H002, PTP820 TCC-B2-XG-MC: N000082H003, PTP820 RMC-B: N000082H004 |
| Firmware versions | PTP820 Release 8.3, PTP820 Release 8.3b512, PTP820 Release 8.3b517 |
Module description
Quoted from the NIST CMVP entry for this certificate.
PTP 820 is a Point-to-Point wireless broadband solution for mission-critical communications in government, industrial and public safety spaces. Integrated with leading networking functionality with the industry most advanced microwave technologies, the platform creates a superior transport solution.
Security level exceptions
- EMI/EMC: Level 3
- Design Assurance: Level 3
- Mitigation of Other Attacks: N/A
Approved algorithms (7)
Other algorithms
Diffie-Hellman (key agreement; key establishment methodology provides 112 bits of encryption strength; non-compliant less than 112 bits of encryption strength); EC Diffie-Hellman (key agreement, key establishment methodology provides between 128 and 256-bits bits of encryption strength); NDRNG; CRC7; CRC16; CRC32; DES; DSA (non-compliant); ECDSA (non-compliant); MD5; RC5
Tested configurations
- N/A
Validation history
| Date | Type | Lab |
|---|---|---|
| 2016-09-21 | Initial | Acumen Security |
| 2018-10-26 | Update | Acumen Security |
Status timeline
As observed by this tracker's snapshots. NIST publishes no dates for list moves; observation began 2026-08-21, so earlier changes carry no date.
- 2026-08-21: first observed by this tracker, status historical
- Validation dates on record: 2016-09-21, 2018-10-26