Aviat Networks Eclipse Cryptographic Module
Caveat: When operated in FIPS mode. Installation of components shall be configured per Section 2.2.1 of the Security Policy
Certificate
| Certificate number | 2869 |
|---|---|
| Standard | FIPS 140-2 |
| Status | historical |
| Overall level | 2 |
| Module type | Hardware |
| Embodiment | Multi-Chip Stand Alone |
| Vendor | Aviat Networks, Inc. · website |
| Hardware versions | INUe 2RU Chassis (P/N EXE-002), Fan Card (P/N EXF-101), Node Controller Card (P/N EXN-004 with FPGA_NCCV2_E1_DS1_004.bit and FPGA_NCCV2_STM1_006.bit), FIPS Installation Kit (P/N 179-530153-001 or 179-530153-002), Replacement Labels (P/N 007-600331-001), at least one of: [RAC 6X (P/N EXR-600-001 with FPGA_RAC6X_PDH_ACM-14.19.52.bit and FPGA_RAC6X_SDH-2.3.1.bit), RAC 6XE (P/N EXR-600-002 with FPGA_RAC6X_PDH_ACM-14.19.52.bit and FPGA_RAC6X_SDH-2.3.1.bit), RAC 60 (P/N EXR-660-001 with FPGA_RAC6X_PDH_ACM-14.19.52.bit and FPGA_RAC6X_SDH-2.3.1.bit), or RAC 60E (P/N EXR-660-002 with FPGA_RAC6X_PDH_ACM-14.19.52.bit and FPGA_RAC6X_SDH-2.3.1.bit)] and all remaining slots filled by excluded components as specified in the Security Policy. |
| Firmware versions | 08.02.91 and 08.03.90 with Bootloader version 1.0.36 |
Module description
This cryptographic module performs encryption of data carried over a microwave radio link.
Security level exceptions
- Cryptographic Module Specification: Level 3
- Design Assurance: Level 3
- Mitigation of Other Attacks: N/A
Approved algorithms
| Algorithm | CAVP certificate |
|---|---|
| AES | 2260, 2418 |
| CVL | 73, 860, 970 |
| DRBG | 323 |
| ECDSA | 902 |
| HMAC | 2634 |
| RSA | 2071, 2239 |
| SHS | 3328, 3397 |
Other algorithms
EC Diffie-Hellman (CVL Cert. #860, key agreement; key establishment methodology provides 128 bits of encryption strength); MD5; NDRNG; DES; Diffie-Hellman (non-compliant)
Tested configurations
- N/A
Validation history
| Date | Type | Lab |
|---|---|---|
| 2017-03-27 | Initial | UL Verification Services, Inc. |
| 2018-03-29 | Update | UL Verification Services, Inc. |
Status timeline
As observed by this tracker's snapshots. NIST publishes no dates for list moves; observation began 2026-08-21, so earlier changes carry no date.
- 2026-08-21: first observed by this tracker, status historical
- Validation dates on record: 2017-03-27, 2018-03-29