808bits

Infoblox Trinzic Virtual Appliances

FIPS 140-2 certificate #4535 · Infoblox · data as of 2026-08-28
Active. Sunset date 2026-09-21, 23 days away. This is the FIPS 140-2 sunset: after it, agencies may keep the module only in existing systems.
Caveat: When operated in FIPS mode

Certificate

Certificate number4535
StandardFIPS 140-2
Statusactive
Sunset date2026-09-21
Overall level1
Module typeSoftware
EmbodimentMulti-Chip Stand Alone
VendorInfoblox · website
Software versionsNIOS version 8.5.2 with Hotfix-NIOS_8.5.2_409296_J81082-506fbabaabd86fbe9c99de0b49c9a7f8-Mon-Oct-25-08-19-32-2021; NIOS version 8.5.2 with Hotfix-NIOS_8.5.2_409296_J81082-506fbabaabd86fbe9c99de0b49c9a7f8-Mon-Oct-25-08-19-32-2021 and Hotfix-8.5.2-NIOS-104148-APPLY-dc66c2dae390f55b5972fb4886eac865-Mon-Jan-20-01-11-47-2025

Module description

Infoblox Trinzic Virtual Appliances enable customers to deploy large, robust, manageable and cost-effective Infoblox Grids. This next-generation solution enables distributed delivery of core network services (including DNS, DHCP, IPAM, TFTP, and FTP) with the nonstop availability and real-time service management required for today's 24x7 advanced IP networks and applications.

Security level exceptions

  • Roles, Services, and Authentication: Level 2
  • Design Assurance: Level 2
  • Mitigation of Other Attacks: N/A

Approved algorithms

AlgorithmCAVP certificate
AESA2507
CKGvendor affirmed
CVLA2505, A2506, A2507
DRBGA2503, A2507
ECDSAA2507
ENT
HMACA2507
KAS
KAS-SSCA2507
KTS
RSAA2507
SHSA2507

Allowed algorithms

RSA (key wrapping; key establishment methodology provides between 112 and 150 bits of encryption strength)

Tested configurations

  • VMWare ESXi 6.7 running on a Dell PowerEdge R740 with processor Intel Xeon Platinum 8280 with PAA
  • VMWare ESXi 6.7 running on a Dell PowerEdge R740 with processor Intel Xeon Platinum 8280 without PAA (single user mode)

Validation history

DateTypeLab
2023-06-15InitialLeidos Accredited Testing & Evaluation (AT&E) Lab
2025-09-11UpdateLeidos Accredited Testing & Evaluation (AT&E) Lab

Status timeline

As observed by this tracker's snapshots. NIST publishes no dates for list moves; observation began 2026-08-21, so earlier changes carry no date.

  • 2026-08-21: first observed by this tracker, status active
  • Validation dates on record: 2023-06-15, 2025-09-11

Source documents