808bits

Juniper Networks SRX345, SRX345-DUAL-AC, SRX380 and SRX1500 Services Gateway

FIPS 140-2 certificate #4625 · Juniper Networks, Inc · data as of 2026-08-28
Active. Sunset date 2026-09-21, 23 days away. This is the FIPS 140-2 sunset: after it, agencies may keep the module only in existing systems.
Caveat: When operated in FIPS mode, installed, initialized and configured as specified in Sections 1.2 and 5 of the Security Policy. The JNPR-FIPS-TAMPER-LBLS tamper evident seals installed as indicated in Section 5 of the Security Policy

Certificate

Certificate number4625
StandardFIPS 140-2
Statusactive
Sunset date2026-09-21
Overall level2
Module typeHardware
EmbodimentMulti-Chip Stand Alone
VendorJuniper Networks, Inc · website
Hardware versionsSRX345, SRX345-DUAL-AC, SRX380, SRX1500 SYS-JB-AC and SRX1500 SYS-JB-DC with JNPR-FIPS-TAMPER-LBLS
Firmware versionsJunos OS 20.2R1

Module description

The Juniper Networks SRX Series Services Gateways are a series of secure routers that provide essential capabilities to connect, secure, and manage work force locations sized from handfuls to hundreds of users. By consolidating fast, highly available switching, routing, security, and applications capabilities in a single device, enterprises can economically deliver new services, safe connectivity, and a satisfying end user experience.

Security level exceptions

  • Roles, Services, and Authentication: Level 3
  • Design Assurance: Level 3
  • Mitigation of Other Attacks: N/A

Approved algorithms

AlgorithmCAVP certificate
AESC2028, C2031, C2034, C2035, C2036, C2039, C2094
CVLC2028, C2033, C2040, C2094
DRBGC2028, C2029, C2031, C2037, C2039, C2094
ECDSAC2031, C2032, C2039, C2094
HMACC2028, C2029, C2030, C2031, C2034, C2036, C2037, C2038, C2039, C2094
KAS-SSCvendor affirmed
KTS
KTS
KTS
RSAC2031, C2032, C2039, C2094
SHSC2028, C2029, C2030, C2031, C2034, C2036, C2037, C2038, C2039, C2094
Triple-DESC2028, C2031, C2034, C2036, C2039, C2094

Allowed algorithms

NDRNG

Tested configurations

  • N/A

Validation history

DateTypeLab
2023-10-04InitialLeidos Accredited Testing & Evaluation (AT&E) Lab

Status timeline

As observed by this tracker's snapshots. NIST publishes no dates for list moves; observation began 2026-08-21, so earlier changes carry no date.

  • 2026-08-21: first observed by this tracker, status active
  • Validation dates on record: 2023-10-04

Source documents