Panorama 11.1/11.2 running on M-200, M-300, M-600 and M-700
Panorama 11.1/11.2 running on M-200, M-300, M-600 and M-700, from Palo Alto Networks, Inc., holds FIPS 140-3 certificate #5352 at overall level 2. The validation is active, with a sunset date of 2031-06-24. Below are its validation history, algorithm certificates and security policy, drawn from the NIST CMVP entry.
Caveat: When installed, initialized and configured as specified in Section 11.1 of the Security Policy. The tamper evident seals and physical kit installed as indicated in the Security Policy
Certificate
| Certificate number | 5352 |
|---|---|
| Standard | FIPS 140-3 |
| Status | active |
| Sunset date | 2031-06-24 |
| Overall level | 2 |
| Module type | Hardware |
| Embodiment | MultiChipStand |
| Vendor | Palo Alto Networks, Inc. · website |
Module description
Quoted from the NIST CMVP entry for this certificate.
The Panorama M-200, M-300, M-600 and M-700 from Palo Alto Networks Inc., hereafter referred to as "Panorama M-Series", "Panorama HW", "modules", or the "cryptographic modules" are multi-chip standalone cryptographic modules designed to fulfill FIPS 140-3 level 2 requirements. Panorama M-Series management appliances provide centralized management and visibility of Palo Alto Networks next generation firewalls. From a central location, you can gain insight into applications, users, and content traversing the firewalls. The knowledge of what is on the network, in conjunction with safe application enablement policies, maximizes protection and control while minimizing administrative effort. Your security team can centrally perform analysis, reporting, and forensics with the aggregated data over time, or on data stored on the local firewall.
Security level exceptions
- Roles, services, and authentication: Level 3
- Operational environment: N/A
- Non-invasive security: N/A
- Life-cycle assurance: Level 3
- Mitigation of other attacks: N/A
Validation history
| Date | Type | Lab |
|---|---|---|
| 2026-06-25 | Initial | Leidos Accredited Testing & Evaluation (AT&E) Lab |
Status timeline
As observed by this tracker's snapshots. NIST publishes no dates for list moves; observation began 2026-08-21, so earlier changes carry no date.
- 2026-08-21: first observed by this tracker, status active
- Validation dates on record: 2026-06-25